Economic Feasibility

Economic Feasibility


General Feasibility Assumptions


  • Revenue


Relies on revenue from existing Power Purchase Agreements

(Sensitivities can be developed from revenue derived from participation in local

Day-Ahead markets)


Additional revenue can be assumed from markets for Capacity and Ancillary Services.


  • Power Production


Based on CES Proprietary Power Production Model


 Inputs:


  1. Plant Nameplate Megawatts
  2. EIA Average Heat Rate for Gas Fired Generation
  3. EIA Average Capacity Factor
  4. Assumed Gas Transmission Let-Down Pressure
  5. Fuel cost per Megawatt Hour
  6. Duration

  • Capital Cost of Technology


(Subject to Site-Specific Conditions and

Prevailing Market Factors)


$1,000 to $2,000 Per Megawatt


(Does not include Site Preparation, Permitting,

Installation and Interconnection costs)


  • ROI


Simple Payback (Years)


Click the link below to request a complimentary, site-specific technical ad economic feasibility  analysis of an applicable CES  use-case.